Service 02 — Cloud Migration

Move to the cloud without the outage story.

From data-centre or legacy hosting to AWS, Azure or Google Cloud — planned in waves, built on landing zones and infrastructure-as-code, with cost governance from day one.

  • AWS · Azure · GCP
  • Landing zones
  • Terraform
  • FinOps
Cloud Migration — Synkrith Innovations
  • 0big-bang cut-overs
  • 3clouds, one playbook
  • 100%infra as code
3Clouds, one migration playbook
0Big-bang cut-overs — every wave is reversible
100%Infrastructure defined as code
30–45%Typical run-cost reduction after optimisation*

Why it matters

Lift-and-shift is a starting point, not a strategy.

Migrations fail in the same three ways: unmapped dependencies, a cloud bill nobody modelled, and a big-bang cut-over on a weekend. We map first, migrate in waves behind reversible cut-overs, and give you the guardrails and cost visibility to run it well afterwards.

Two ways to migrate

Big bang vs. waves.

The usual approachThe Synkrith approach
Weekend cut-over of everythingWaves of 3–8 workloads with parallel runs
Dependencies discovered mid-migrationDependency map and TCO model before anything moves
Rollback is a hopeRehearsed cut-over and tested rollback per wave
Bill surprises in month twoBudgets, tagging and anomaly alerts from day one
Console-built infrastructureEverything as Terraform in pull requests
Handover is a documentRunbooks, training and shadowed operations

How it runs

Five phases, each with a dated deliverable.

  1. 012–3 weeks

    Discover

    Inventory, dependency map, compliance constraints and the business case with a modelled run-rate on each cloud.

  2. 022–4 weeks

    Design

    Target architecture, landing zone, network and identity design, migration strategy per workload and the wave plan.

  3. 033–5 weeks

    Foundation

    Landing zone, connectivity, CI/CD and observability delivered as code before the first workload moves.

  4. 04Per wave: 1–3 weeks

    Migrate

    Lowest-risk workloads first, parallel runs, cut-over rehearsals, then production with a tested rollback.

  5. 05Ongoing

    Optimise

    Right-sizing, cost reviews, runbooks and training so your team owns the estate with confidence.

Wave planning

A typical wave plan.

Illustrative sequencing for a mid-size estate — low-risk and loosely coupled first, the crown jewels last.

Wave 1Wave 2Wave 3Wave 4
Dev & test environments
Internal tools & static sites
Stateless web tier
Databases & data stores
Core transactional systems
Legacy & regulated workloads

What we deliver

Migration capabilities.

01

Discovery & TCO modelling

Application and dependency mapping, right-sizing, licensing review and a total-cost model you can take to the board.

02

Landing zones & guardrails

Multi-account / subscription structure, identity federation, networking, logging and policy-as-code so every workload lands in a governed environment.

03

Migration waves

Rehost, replatform or refactor decided per workload, executed in waves with blue-green or parallel-run cut-overs and tested rollback.

04

Data & database migration

Zero-/minimal-downtime database moves with DMS, replication and validation, plus object storage and file-share migration.

05

Infrastructure as Code

Everything provisioned with Terraform or CloudFormation / Bicep, reviewed in pull requests and deployed through pipelines.

06

FinOps & optimisation

Tagging, budgets, anomaly alerts, reserved / savings plans and post-migration right-sizing so the bill goes down after month one.

Rehearsed twice, executed once. — Cloud Migration

Cut-over night

Rehearsed twice, executed once.

Every production wave is preceded by a full dress rehearsal with the same runbook, the same people and the same rollback trigger. By the real night, it's routine.

  • Named go / no-go owners
  • Minute-by-minute runbook
  • Rollback decision points agreed in advance
Hybrid by design, not by accident. — Cloud Migration

Connectivity

Hybrid by design, not by accident.

Private connectivity, DNS strategy and identity federation are designed so systems can straddle on-prem and cloud safely for as long as a wave plan needs.

  • Direct Connect / ExpressRoute / Interconnect
  • Split-horizon DNS
  • Federated identity from day one

Outcomes

What the numbers look like after optimisation.

  • Monthly run cost−38%
  • Provisioning time (days → hours)−92%
  • Patch cycle (weeks)−75%
  • Unplanned downtime−80%
BeforeAfter

Illustrative — replace with your own baseline after discovery.

Engagement models

Three ways to work with us.

FAQ

Migration questions.

Which cloud should we choose?

It depends on existing licensing, team skills, data gravity and compliance needs. Discovery produces a like-for-like cost and capability comparison so you decide on evidence.

How long does a migration take?

A single application can move in weeks. An estate of dozens of workloads typically runs in waves over a few months. Discovery gives you a dated wave plan.

Can we keep some systems on-prem?

Yes. Hybrid designs with private connectivity are common, especially for regulated data or latency-sensitive systems.

What about our database licences?

Licence portability, bring-your-own-licence options and managed-service alternatives are all costed in the TCO model.

Do you migrate to Kubernetes as part of this?

Only where it's the right target. Many workloads are better on managed services first; containerisation can be a later wave.

Who operates it afterwards?

Your team, with our runbooks and training — or us, under a managed-cloud agreement.

Cloud Migration — Synkrith Innovations

Let's build

Get a dated wave plan.

A migration assessment gives you the inventory, the cost model and the sequencing — whether or not you migrate with us.